Sunday, September 29, 2013

House Assembly Begins

Panel forming quality improved with each panel made … controlling the variables.

All panels have been completed and most all “welded” together. Panels are chemically welded together with same structural foam materials. A very good bond.

                

For this house, a foundation is formed with the wood columns integrated, which will hold up the roof structure. In poverty housing situations, IDP and refugee camps (to save funds and speed construction to 2 days), the house will be assembled direction the ground, and then a floor installed within the walls of the house. This will in no way affect the performance, or life of the house.

            



Thanks again to IADDIC shelter for their help and support prior and during this trip, and the prototype construction.  http://iaddicshelters.net




No comments:

Post a Comment